Sign In  |  Register  |  About Los Altos  |  Contact Us

Los Altos, CA
September 01, 2020 1:26pm
7-Day Forecast | Traffic
  • Search Hotels in Los Altos

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Grid Battery Metals Files NI 43-101 Technical Report on its Clayton Valley Lithium Project in Nevada

COQUITLAM, BC / ACCESSWIRE / March 6, 2024 / Grid Battery Metals Inc. (the "Company" or "Grid Battery") (TSXV:CELL)(OTCQB:EVKRF)(FRA:NMK2) is pleased to announce that the NI 43-101 Technical Report for Grid's Clayton Valley Lithium Project, dated March 4, 2024, prepared by Mr. Steven McMillin P.G. of Rangefront Geological, has been filed on SEDAR+ (www.sedarplus.ca) and can be viewed on the Company's website at Clayton Valley Technical Report.

At the Clayton Valley Lithium Project, the Company contracted the services of Rangefront to perform an updated and revised NI 43-101 Technical Report. To complete the Technical Report, the Company used the results of prior soil samples, geophysical surveys, and drilling on the property, to help identify structure and target areas favorable to lithium accumulation and determine next steps for its overall exploration plan. The recommended 2024 exploration plan includes additional CSAMT geophysical survey work, additional soil sampling, and a subsequent multi-hole exploratory drilling program on the property.

Mr. Tim Fernback Grid President & CEO comments "We are happy to report the filing of the NI 43-101 Technical Report on our Clayton Valley Lithium Project. The recommendation for future exploration ultimately includes a drilling program as a logical next step here on the property. The timing is good for the Company, and with approximately CAD$7.0 million in our treasury, we are well-positioned and fully funded for our 2024 exploration season."

Mr. Fernback continues "Clayton Valley holds the only producing lithium brine system in the United States and holds amazing potential for lithium clay-hosted deposits. Our lithium claims in Clayton Valley are bordering the Silver Peak Lithium Project of Albemarle Corporation (NYSE:ALB), home to the only producing lithium mine in North America. Previously, Albemarle Corporation announced that it will continue to invest in its Silver Peak mine in order to double lithium production by the year 2025. Another neighbour of ours to the east, Century Lithium Corp. (TSXV:LCE)(OTCQX:CYDVF), has issued a pre-feasibility study referencing a 26% after-tax internal rate of return and an NPV8 of $1.03 billion. Furthermore in May 2023, Nevada was ranked again as the #1 Mining Jurisdiction in the world by the Fraser Institute, a position it has held several times in the recent past. Our plan at Grid is to realize the potential of this area of Nevada for lithium-hosted brine and claystone for our shareholders."

Clayton Valley Property

It should be noted that results from any adjacent property(s) are not an indication of what may be found on the Company's property(s).

About Rangefront Geological

Elko Nevada-based Rangefront Geological has combined in-depth expertise with cutting-edge technology to provide mining consulting services, contract labor, field crew services, and vehicular support to the mining industry. With services available across North America, Rangefront works closely with its clients to provide high-quality mineral exploration services.

Qualified Person

Mr. Steven McMillin, P.G. is a Qualified Person as defined by National Instrument 43-101 and has approved the technical information contained within this news release.

About Grid Battery Metals Inc.

Grid Battery Metals Inc. is a Canadian based exploration company whose primary listing is on the TSX Venture Exchange. The Company's maintains a focus on exploration for high value battery metals required for the electric vehicle (EV) market.
www.gridbatterymetals.com

About Texas Springs Property

The Company owns a 100% interest in the Texas Spring Property which consists of mineral lode claims located in Elko County, Nevada. The Property is in the Granite Range southeast of Jackpot, Nevada, about 73 km north-northeast of Wells, Nevada. The target is a lithium clay deposit in volcanic tuff and tuffaceous sediments of the Humbolt Formation. A Phase 1 exploration program at the Texas Springs Property (Fall 2023) yielded results with average lithium grades of 2010 ppm, applying a 1,000 ppm cut-off, and up to 5,610 ppm Lithium.

The Texas Spring property adjoins the southern border of the Nevada North Lithium Project - owned by Surge Battery Metals Inc. ("Surge") (TSXV:NILI),(OTC:NILIF) and comprised of 725 mineral claims. Surge's first round of drilling identified strongly mineralized lithium bearing clays. The average lithium content within all near surface clay zones intersected in the 2022 drilling program, applying a 1000 ppm cut-off, was 3254 ppm. (Press release March 29, 2023). More recent results have shown higher grade lithium up to 8070 ppm on this property after initial drilling (Press release September 12, 2023). Our exploration results are on-trend with these results.

About Clayton Valley Lithium Project

The Company owns a 100% interest in 113 lithium lode and placer claims covering over 640 hectares in Clayton Valley. Clayton Valley is a down-dropped closed basin formed by the Miocene age Great Basin extension and is still active due to movement along the Walker Lane structural zone. As a result, the basin has preserved multiple layers of lithium bearing volcanic ash, resulting from multiple eruptive events over the past 6 million years including eruptions from the 700,000-year-old Long Valley Caldera system and related events. These ash layers are thought to contribute to the lithium brines extracted by Albemarle and are also likely involved in the formation of the exposed lithium rich clay deposits on the east side of Clayton Valley.

Volt Canyon Lithium Property

The Company owns a 100% interest in 80 placer claims covering approximately 635 hectares of alluvial sediments and clays located 122 km northeast of Tonopah, Nevada.

About the British Columbia, Nickel Projects

The Mount Sidney Williams Group consists of three claim blocks with a total area of 10,569 hectares in the area surrounding Mount Sidney Williams, both adjoining and near the Decar project of FPX Nickel Corp., located 100 kilometres northwest of Fort St. James, B.C., in the Omineca mining division. Metallic mineralization includes nickel, cobalt, and chromium. At least some of the nickel mineralization occurs as awaruite. The Mitchell Range Group area claim consists of one claim block covering 8,659 hectares with demonstrated metallic mineralization including nickel, cobalt, and chromium. Nickel cobalt mineralization has not been well explored, but the presence of awaruite has been documented. The Company's B.C. Nickel properties are held within Grid's wholly-owned subsidiary, AC/DC Battery Metals Inc.

The Company has previously announced plans to spin out its wholly-owned subsidiary, AC/DC Battery Metals Inc., finance it separately, and separately list it on the TSX Venture Exchange in 2024. This transaction once complete, will provide a valuable share dividend to each Grid Shareholder of record for no additional cost.

On Behalf of the Board of Directors

"Tim Fernback"

Tim Fernback, President & CEO

Contact Information:
Email: info@gridbatterymetals.com
Phone: 604- 428-5690

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements which include, but are not limited to, comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward-looking statements. It should be noted that results from any adjacent property(s) are not an indication of what may be found on the Company's property(s).

SOURCE: Grid Battery Metals Inc.



View the original press release on accesswire.com

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 LosAltos.com & California Media Partners, LLC. All rights reserved.