Sign In  |  Register  |  About Los Altos  |  Contact Us

Los Altos, CA
September 01, 2020 1:26pm
7-Day Forecast | Traffic
  • Search Hotels in Los Altos

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Westinghouse Receives First-Ever Approval for Incremental Burnup by the U.S. Nuclear Regulatory Commission

Incremental burnup increases fuel utilization and reduces fuel cycle costs for U.S. utilities

Westinghouse Electric Company received the Nuclear Regulatory Commission’s approval for an increase in the burnup limit for the Westinghouse Encore® fuel designs. This allows better nuclear fuel efficiency, longer times between reactor refuels and lower operating costs.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20240815379737/en/

Westinghouse engineers developing core designs with higher (or incremental) burnup, which brings value to utility customers. (Photo: Business Wire)

Westinghouse engineers developing core designs with higher (or incremental) burnup, which brings value to utility customers. (Photo: Business Wire)

United States Pressurized Water Reactors currently operate on 18-month fuel cycles, and this new higher burnup fuel will enable reductions in feed batch size, thereby improving fuel cycle economics. This is the first time nuclear fuel batch reloads in the United States will be able to exceed a burnup limit of 62 GWd/MTU, paving the way for a future extension to benefit utilities to operate economically on 24-month fuel cycles.

“We are very pleased to receive approval from the Nuclear Regulatory Commission for incremental burnup in our nuclear fuel,” said Tarik Choho, Westinghouse President of Nuclear Fuel. “This milestone marks the start of production of nuclear fuel with increased capacity for Pressurized Water Reactors, vastly improving fuel costs for U.S. utility customers.”

The incremental burnup approval represents a key milestone for the Encore® Accident Tolerant Fuel Program, an initiative started in 2012 and funded by the Department of Energy, aimed at increasing performance and safety of nuclear reactors in support of U.S. energy security and climate goals.

Westinghouse is a leading supplier of nuclear fuel, providing a uniquely diversified portfolio in the industry across nuclear reactor types, including PWR, BWR, AGR and VVER. Through our world-class manufacturing facilities in the United States, the United Kingdom and Sweden, we focus on delivering innovative fuel technologies to meet our customer needs for lower fuel cycle costs, increased operational flexibility and efficiency, diversity of supply and accident-tolerant products. Westinghouse is creating a center of excellence for Low Enriched Uranium Plus (LEU+) fuel manufacturing in South Carolina to reduce the number of outages needed in nuclear plants. Learn more about our advanced fuel capabilities and how they relate to different reactors around the world: Westinghouse Nuclear > Nuclear Fuel

Westinghouse Electric Company is shaping the future of carbon-free energy by providing safe, innovative nuclear and other clean power technologies and services globally. Westinghouse supplied the world’s first commercial pressurized water reactor in 1957 and the company’s technology is the basis for nearly one-half of the world's operating nuclear plants. Over 135 years of innovation make Westinghouse the preferred partner for advanced technologies covering the complete nuclear energy life cycle. For more information, visit www.westinghousenuclear.com and follow us on Facebook, LinkedIn and X.

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 LosAltos.com & California Media Partners, LLC. All rights reserved.